Helpful tips

What are merge points?

What are merge points?

Point Merge is designed to work in high traffic loads without radar vectoring. iT is based on a specific P-RNAV route structure, consisting of a point (the merge point) and pre-defined legs (the sequencing legs) equidistant from this point.

What is TBC data?

TBC includes Google Earth tools that allow you to overlay your survey data on a current Google Earth basemap to create a user-friendly visualization for a project. TBC also has built-in background maps and DigitalGlobe imagery to provide a convenient verification of project location.

What is TBC in software?

The TBC suite is a desktop application for processing and managing optical, GNSS, and imaging survey data. For post-processed static or kinematic surveys, TBC requires a license to enable full functionality including GPS baseline processing. A license is not needed to view and export processed results from RTK surveys.

Is zipper merge a law?

This further complicates the common understanding of proper merging protocol, as even though zipper merging is widely encouraged, those doing so are still legally required to yield, and those who choose not to let them merge are not doing anything wrong from a legal standpoint.

How do I export selected points in Civil 3d?

Do one of the following:

  1. Click Output tab Export panel Export Points Find to export all the points in a drawing.
  2. In Toolspace, on the Prospector tab, expand the Point Groups collection. Right-click the point group name Export Points to export only the points in a point group.

How do I create a TTM file?

To create the TTM file:

  1. Select the Export option.
  2. Select the Construction tab.
  3. Select TTM Exporter.
  4. Select the surface that you want to use for draping.
  5. Click the cloud icon and select the Trimble Connect project and folder to place the TMM in.
  6. Click Save and then Export.

What is a Trimble DC file?

The DC files are created by the TSC2 and TSC3 collectors of Trimble, the program that carries out the post-process is GPSeismic, it is very functional because in it I can change the coordinates of the base and modify the coordinates of the measured points, also allows to edit points in a friendly way.

Does zipper merge really work?

I drove across four states that take different approaches to merging, and learned that the zipper merge doesn’t really work in the real world. It only leaves traffic stranded and idling on the interstate, creating a waste of time and increased pollution in its wake.